TDBFP To MDBFP changeover

TDBFP To MDBFP changeover


  • Take MDBFP out from its Standby Position.
  • Close Solenoid valve SOV-92,SOV-93, Scoop will be adjusted to 0% and Discharge valve will be closed with its IBV
  • Give ON command to MDBFP.
  • Increase scoop to develop pressure
  • At around 40 ksc .Open MDBFP Discharge valve
  • Keep on increasing scoop till it matches with running TDBFP Discharge Pressure & Flow >550 tph
  • When Discharge Pressure is equal and flow is that sufficient, it gives permissive to close MDBFP R/c valve,
  • Close MDBFP R/c Valve while give negative bias to TDBFP and Open its r/c Valve
  • Take out TDBFP from Remote to Local
  • Start unloading it to around 4000 rpm and flow>200 TPH
  • Take a round of the MDBFP and observe Parametrs of MDBFP, if found ok,
  • Trip the TDBFP