Stage-II 3.5m Switchgear Breaker Operation

Isolation:

  • First put it out of Standby position
  • Insert key and put the Breaker in Switch-gear mode
  • Open the control supply cabinet using cabinet key
  • Plug out DC fuse in the left bottom of panel
  • Open Breaker cabinet panel using cabinet key
  • Unlock the Breaker
  • Insert Racking lever in the slot allowed
  • Lift this lever upward, Breaker will move outside
  • Plug out  the control supply rack
  • Again insert the lever and push down ward
  • Breaker will move out of cabinet
  • Pull the Breaker out
  • Ensure bus shutter is down
  • Lock the bus shutter
  • Again insert Breaker
  • Close cabinet doors.
Normalisation:

  • Open cabinet doors.
  • Pull out the breaker form cabinet
  • Open the Bus shutter lock
  • Plug in  the control supply rack to breaker
  • Insert Breaker by first Upward and then Downward  movement of lever
  • Lock the Breaker in position
  • Close the cabinet door by cabinet key
  • Open the control supply panel using cabinet key
  • Plug in the DC control fuse
  • Close the Control panel door
  • Put the Mode-Remote using Key
  • Reset all relays.