CRE-9
- PA Header Control
- BCW-C OLCS
- CMC Logic
- Metal Temp SH, RH
- Economiser Bypass Damper control
- PA Header Pressure Bad/ PA Header control Parameters Bad
- BCW-C Parameters Bad
- CMC Logic out
- Metal Temp Bad
- Eco Bypass Damper Control Bad
- Take Machine in Hydraulic mode and Isolate EHTC from Rack
- Isolate PA fan Blade-pitch supply from Switch-gear or actuator Control to Manual/OFF from local
- Take CB of BCW-C in switchgear mode from switchgear
- Now Call the C&I Personnel to force PA Header Pressure Transmitter value(T1,T2, T3) to near the freeze value that is 820 mm WC
- Give healthy value to PA Hdr Pressure selector (Putting ! before each xmtr value )in Header control tag
- Now Rectify DPU Problem/ Reset it
- Ensure both DPU working fine
- Now Normalise Both PA fan BLade Pitch from local/Switchgear
- Modulate Blade-pitch of both PA fans
- Put Blade-Pitch on auto and Control in Auto too
- Normalise BCW-c from switchgear
- Put machine in EHG by normalising from local rack
- Put machine in CMC