Tuesday, November 14, 2017

CHECK LIST FOR AIR INGRESS IN CONDENSER

CHECK LIST FOR AIR INGRESS IN CONDENSER
Sl No
Description
Location
Checked status
1.       
Valve gland sealing water pressure (UCB).
UCB

2.       
Gland steam pressure & temp
UCB

3.       
Vacuum breaker Valve
17 mtr

4.       
HPT / IPT / LPT glands
17 mtr

5.       
TDBFP-A  gland
17 mtr

6.       
TDBFP-B  gland
17 mtr

7.       
LPT Diaphragm
17 mtr

8.       
TDBFP-A  Diaphragm
17 mtr

9.       
TDBFP-B  Diaphragm
17 mtr

10.   
LPT Manholes  ( both side )
17 mtr

11.   
TDBFP-A  exhaust valve
8.5 mtr

12.   
TDBFP-B  exhaust valve
8.5 mtr

13.   
LPH-2/3 vents to condenser
8.5 mtr

14.   
HPHs vents to condenser
8.5 mtr

15.   
LPH-2 shell side vent line valves & flanges
8.5 mtr

16.   
LPH-3 shell side vent line valves & flanges
8.5 mtr

17.   
Vaccum p/p-1/ 2 suction line manual valve glands at condenser
8.5 mtr

18.   
Condenser Man holes (8.5 mtr both sides)
8.5 mtr

19.   
LPH-1 Emergency drip to condenser( LCV-0700)
0 mtr

20.   
LP Header-2 drip line ( LCR-0757B-HD4-022)
0 mtr

21.   
LP Header-3 drip line to condenser
0 mtr

22.   
HPH-5A/5B emergency drip to condenser
0 mtr

23.   
Drainn valves connected to TFT-1/2
0 mtr

24.   
TFT-1/2 header connections
0 mtr

25.   
Condenser level transmitters.
0 mtr

26.   
Condenser level Switches.
0 mtr

27.   
Vaccum pump-1, 2 suction line manual and motorised valve glands and flanges.
0 mtr

28.   
Deaerator  to condenser valve glands (Co-I5I)
0 mtr

29.   
CEP recirculation lines-A, B, C valve glands.&vents and drains
0 mtr

30.   
LPH-1 normal drip top condenser valves.
0 mtr

31.   
CEP – A/B/C glands
(- m  mtr)

32.   
CEP – A/B/C   suction strainers & vents
(- m  mtr)

33.   
CEP – A/B/C suction line drains
(- m  mtr)

34.   
Hotwell drain line passing
(- m  mtr)

35.   
CEP suction and discharge line flanges
(- m  mtr)

36.   



37.   





No comments:

Post a Comment