Thursday, November 2, 2017

Hydra-step Normalisation

Hydra-step Normalisation Procedure


  • Close Hydrastep drain full-tight
  • Close Hydrastep Vessel Vents full tight
  • Open steam side root valve
  • Open Water side root valve
  • Crack Open steam side down-stream valve
  • Allow steam to condense in the vessel
  • Crack open Water side Down-stream valve when all ports start showing green
  • Open steam side down-stream valve full
  • Open water side down-stream valve full

No comments:

Post a Comment