N2 purging in Primary Water System

N2 purging in Primary Water System

  • Fit N2 cylinder in N2 supply station  in Gas Filling room (0 m )
  • Isolate the Relief valve by closing isolating manual valve before it.(8.5 m)
  • Slowly vent out the N2 in the system up to 0.2 ksc by opening vent open to atmosphere (these all are present at 8.5 m)
  • Close the vent when pressure is 0.2 ksc.
  • Now start filling N2 through N2 filling station rack
  • As pressure reaches 0.5 ksc, Cut off the N2 supply
  • Wait for an hour to mix N2 with the system gases.
  • Purge out this gaseous mixture from opening vent open to atmosphere upto 0.2 ksc. Close the vent.
  • Repeat this process 5-6 times.
  • Inform Chemistry to take sample of PW and check Dissolved Oxygen.
  • If DO is greater than 20 ppb. Repeat above steps.
  • As DO reaches  less than 20 ppb, tightly close vent open to atmosphere and open the isolating valve of Relief valve.