- Ensure the CEP is Mechanically & Electrically normal
- Ensure the CEP you want to take in service in standby(Vent Open, Outlet valve open, R/c valve greater than 60% open)
- Give On command to CEP
- As discharge header pressure starts increasing, Start Opening the r/c valve of CEP- you want to take out of service
- As the CEP is fully loaded and discharge header pressure is not in rising trend
- Give Stop command to other CEP
- And put that CEP in Auto Standby mode and wait till it displays, Ready Standby
- Ensure there is no abnormality in local by sending operator.
- Observe parameter, if any deviation found, take immediate action.
Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
Thursday, November 2, 2017
CEP changeover
Subscribe to:
Post Comments (Atom)
-
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
-
Generator Air Tightness Test Period Of Test= 24 Hrs without a Break Air Pressure Drop (Allowed in 24 Hrs) : <=0.15 ksc Air Test Pre...
No comments:
Post a Comment