Wednesday, November 1, 2017

TG Vacuum Pump Change-over

  • Ensure SLC vacuum pump is ON
  • Send operator in local to drain the vacuum pump casing
  • Give ON command to sealing Recirculation pump
  • After 3-5 seconds, Give ON command to Vacuum pump
  • As the DP greater than 0.15 ksc Open Permissive to Solenoid operated vacuum inlet valve goes green, Open the solenoid valve
  • Now , wait for few seconds and ask operator if their is any abnormality, take immediate action if found any
  • Now, Give OFF command to Solenoid valve of other running vacuum pump
  • Give OFF command to Vacuum pump and then OFF sealing water Recirculation pump.
  • Observe vacuum

No comments: