- Ensure SLC vacuum pump is ON
- Send operator in local to drain the vacuum pump casing
- Give ON command to sealing Recirculation pump
- After 3-5 seconds, Give ON command to Vacuum pump
- As the DP greater than 0.15 ksc Open Permissive to Solenoid operated vacuum inlet valve goes green, Open the solenoid valve
- Now , wait for few seconds and ask operator if their is any abnormality, take immediate action if found any
- Now, Give OFF command to Solenoid valve of other running vacuum pump
- Give OFF command to Vacuum pump and then OFF sealing water Recirculation pump.
- Observe vacuum
Wednesday, November 1, 2017
TG Vacuum Pump Change-over
Subscribe to:
Post Comments (Atom)
ST-1 Shutdown
ST-1 SHUTDOWN PROCEDURE (Note-Tie CB means CB for tie between station buses as applicable) 1. Switch OFF SD bus I/C DC supply . 2. Ensur...
-
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
-
Generator Air Tightness Test Period Of Test= 24 Hrs without a Break Air Pressure Drop (Allowed in 24 Hrs) : <=0.15 ksc Air Test Pre...
No comments:
Post a Comment