Dadri stage-1 Turbine Interlock & Protection
- Lub Oil Pr: Alarm=2.0 ksc. Trip=1.88 ksc Effect: Turbine Trips, Barring gear Protection Close,Vacuum Breaker Opens
Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
Dadri stage-1 Turbine Interlock & Protection
PROCEDURE FOR RESERVE SHUT DOWN OF STAGE-1 UNITS
PREPARATIONS
In case of both station transformer tripping following disturbance will be observed
|
1
|
At
least 2 BCW pump in Serrvice
|
|
|
|
2
|
Both
SAPH and PAPH Running |
|
|
|
3
|
Turbine
: On Barring (AOP,JOP,SOP, HPCF in service) |
|
|
|
4
|
Generator:
PW system, Seal Oil system, Gas system |
1
|
Inform & Ensure
availability of TMD/EMD/C&I
|
|
2
|
SG/TG/BOP source-2 AC
Power Supply Interruption. Inform C&I for Standby chargers
|
|
3
|
Ensure DG Set Tank Oil
Level Adequate
|
|
4
|
Evacuate and Isolate
Boiler Passenger, Service Building Lift and Isolate. Inform EMD(temporary
supply )
|
|
5
|
Arrange 3 Walky Talky
: 1-CR 2-DG board 3-DG Set room
|
|
6
|
Note Down Initial
Parameters of DG Set |
1
|
At least 2 BCW pump in Serrvice
|
||
2
|
Both SAPH and PAPH Running
|
||
3
|
Turbine : On Barring
(AOP,JOP,SOP, HPCF in service)
|
||
4
|
Generator: PW system, Seal Oil
system, Gas system
|
||
5
|
Condenser Pass : Both Charged
|
||
6
|
PAC & IAC : 1 PAC & 2
IAC in Service
|
||
7
|
CEP & Make-up : 1 CEP with H/W Make-up on auto |