Check List (Light-Up)
Unit:
S.No
|
Activity
|
Status
|
Remark
|
1
|
Drum
Level, RH Protection Bypass
|
||
2
|
Seal
Trough charged & Bottom Hopper filled
|
||
3
|
ESP
field Ready & Off
|
||
4
|
SADC
In auto
|
||
5
|
LPD
close, Drum SH Vents Open, SH drains Open, Eco-Recirculation Open
|
||
6
|
APH
blowing Lined-up
|
||
7
|
All
3 BCW Running
|
||
8
|
CBD
Manual Open, EBD Auto close Bypass
|
||
9
|
LP
dosing & Both CPU i/s
|
||
10
|
FG
& Air path OK/ PAPH-A/B FG outlet Damper closed
|
||
11
|
All
Mills & Feeders Ready
|
||
12
|
Hotwell
& Deaerator Normal
|
||
13
|
SH/RH/HPBP
spray Manual closed(Turbine Side)
|
||
14
|
MAL
Drains/SDFT/UFT Manual Open
|
||
15
|
MS/HRH
strainers drain to UFT,SDFT Open
|
||
16
|
Vacuum
Pulled,TDBFPs on Barring/Rolled upto 1000 rpm through PRDS
|
||
A
|
Light-UP
|
||
1
|
Note
Boiler Light-up Time ( 1st gun I/s)
|
Time of BLU:
|
|
2
|
Feed
Drum through 30% line by TDBFP(Maintain DP>10 ksc) Or MDBFP
|
||
3
|
Close
Drum/SH Vents at 2 ksc Drum Pressure
|
||
4
|
BSV
Open at 5ksc Drum Pressure
|
||
5
|
|||
6
|
Start-up
vents Close after HPBP/LPBP Charging
|
||
7
|
Close
SH Drains at 10 ksc Drum Pressure
|
||
B
|
Before Rolling
|
Time Before rolling:
|
|
1
|
Before
PA Fan start,Open 2 Mills CAG/CAD, start PA Fan,Open PAPH FG o/l
|
||
2
|
Ensure
only one Seal air Fan Running
|
||
3
|
One
Mill A/C to be taken i/s as per HP Casing Metal Temp
|
||
4
|
Bring
Rolling Parameter, Note Time Before rolling
|
||
5
|
Turbine
EHTC Normal from Local
|
||
6
|
HP
ESV/IV/CV /CRH gagging Removed
|
||
7
|
Decrease
TG LO SP to 45 Deg
|
||
8
|
Turbine
LP Mode, Load Ref 50 MW, Pr Max 75 MW, Th Pr SP=30 Ksc
|
||
C
|
Before Synchronization
|
||
1
|
GT
Isolators from s/Y Closed
|
||
2
|
GRP
relays Reset
|
||
3
|
One
Mill i/s and Other Warmed-up(Hot Air charged)
|
||
4
|
HPBP
spray Manual Open when Downstream Temp crosses 330 Deg
|
||
D
|
After Synchronization
|
Time Of sync:
|
|
1
|
SH/RH
sprays from turbine Side Normalized. Monitor MS/HRH Temp
|
||
2
|
PW/CG
Controller on auto
|
||
3
|
LPH/Deaerator
charged
|
||
4
|
MAL/SDFT/UFT
Manual drains closed
|
||
5
|
ST/UT
Change-over at 100 MW
|
||
6
|
FRS
High Range at 180 MW from 30 % line change-Over
|
||
7
|
Oil
guns taken out (>5 Mills i/s: scanner Healthy), Note time of Oil w/d
|
||
8
|
ESP
field charging after Oil guns taken out
|
||
9
|
Boiler
silica to be monitored Before Load Increase
|
Checked By
|
|
Name
|
|
Sign
|
|
Designation
|
Comments