Cold start-up
Points to Remember
Ø maximum
of HP casing and HP shaft is less than 150°C(more
than 5 days)
Ø It
requires soaking of Turbine at 360 rpm with steam(40ksc,360 Deg)
Ø An
upper limit of 200°
C/hr. saturation temp gradients can be allowed, i.e.
approximately the boiler pressure can be brought to 20 Kg/ Cm2 within
an hour of cold start up
Ø But
actual temp gradient is limited by the thick walled Y piece
provided in the main steam and HRH lines
Ø maximum
differential temp allowed between inner (98%) and mid wall temp (50%)
is ±40°C
Ø Start
only two CC pumps in order to minimize flashing in down
comers (and subsequent vibration) when the boiler water is in the
range of 85°
to 125°
C
Ø third
pump should be started before drum pressure
reaches 7 Kg/Cm2 to minimize the temperature
transients experienced by the pump casing ( this is to avoid fast load
out back on the boiler in the event of any CC pump tripping).
Ø To
get the rolling parameters, normally two elevation oil guns are taken
with approx. 70 to 80 t/hr. flow through HP-LP bypass. At that
time MS parameters would be 40 Kg/Cm2 and 360°
C.
Ø As
soon as the turbine loading has started, HP/LP by pass closes
Ø First
mill is put into operation around 10% of generator load
Ø Second
mill is put into operation around 25%
Ø Third
mill at 40% of generator load
Ø Fourth
and fifth mills are put into operation at 60% and 80% of generator load
respectively
Ø Sixth
mill is taken to reach full generator load
Ø During
loading the RH outlet steam temperature has to be kept as close as possible to
SH outlet steam temp. Burner tilt, SH spray, RH-spray controls have to be
adjusted accordingly
Procedure
SNo
|
Time
|
Condition
|
Action
|
Follow-up
|
Status
|
1
|
0
ksc
|
Charge
PRDS from other Units (14ksc,>260 Deg)
|
Open
drains at PRDS,TG Floor,8.5 m
|
||
Charge
Atomizing steam(Pr 6.5 ksc)
|
Open
drains at 4 elevation
|
||||
Fill
Water upto +200 mm
One
CEP i/s
LPH,HPH
charged from FW side
Deaerator
Level =175 mm
Hotwel
b/w -100 to -200 mm
FRS
30 % to fill Drum /load upto 180 MW
|
Drum,
SH, RH Vents , SH Drains : Open
LPD
: Drains Closed
BSV
: closed
Drain
Before BSV :Closed
MS
strainer drains UFT/SDFT: Open
HRH
strainer Drain UFT/SDFT : Open
ECO
Recirculation E20 Manual : Open
|
||||
Charge
LDO upto HOTV
|
|||||
ESP
ready in charge Condition
|
Open
i/l, o/l damper of passes
|
||||
Bottom
Hopper & Seal Trough Lined-up
|
|||||
EAST,
Excitation panel, GRP Panel Ready
|
|||||
Generator
gas Pr= 3.5 ksc
|
|||||
H2
cooler,PW system Ready
|
|||||
Start
one CC pump
|
Drum
>+200 mm, Vents B3,B4,B5,B6 Closed
|
||||
Start
second CC Pump
|
Drum
normal =+50 mm, B3, B4,B5,B6 Closed
|
||||
Start
Scanner Fan
|
|||||
Start
Both SAPH
|
Air
Motor availability to be checked
FG/Air
Inlet/Outlet Dampers Open
|
||||
Start
Both PAPH
|
Air
Motor availability to be checked
Air
Inlet/Outlet Dampers Open
FG
Inlet/Outlet Dampers closed
|
||||
Start
one set ID/FD, Air>30% (600 TPH)
|
SADC
100 % (auto)
|
||||
Charge
SCAPH for Running FD Fan
|
Check
for Increase in Air Temp at SAPH i/l
|
||||
Start
Purge (Duration : 5 min)
|
HOTV,
LOTV got reset
SADC
will released from 100 % in auto
|
||||
Machine
on Barring
|
LO
Temp=45 Deg, Speed=80-100 rpm
JOP
Header Pr=140 ksc
Start
MOT Centrifuge
HPCF
Charged, Temp=55 Deg
|
||||
2
|
0'
|
Boiler Ready
& turbine on Barring
|
Start
4 guns in AB elevation
After 30', Start 4 guns in CD elevation
To
match Drum MTM Raise 2 Deg/Min
|
LDO
control Pressure =9 ksc
Start
: Pair AB 1/3 and after 7 sec AB 2/4
Check
scanner Intensity / Local Verfied
Start
: Pair CD 1/3 and after 7 sec CD 2/4
Open
E20 R/C valve, if MDBFP not feeding in Drum
Check
Drum Level/ Open CBD
Check
D/A Level & H/W level
|
|
Start
GSC Exhauster fan
Charge
Seal steam upto Supply Motorized v/v of GS supply station
Start
Vacuum Pumps one by one
|
Open
dtain before NRV
Steam
Temp >250 Deg
Drain
Casing of Pumps,
Fill
Receiver tank >80 % in VG
|
||||
At
-0.2 ksc, charge seal steam
|
By
bringing controller from 50 % towards zero
Build
Vacuum upto -0.9 ksc
|
||||
Open
HPBP Warm-Up drains
|
|||||
Switch
on SLC Drains
|
Verify:
Manual v/v Opened
|
||||
3
|
60'
|
Drum
Pr= 2ksc
|
Close
SH/RH Header Vents
Close
SH Header drains at Dr Pr =10 ksc
Open
BSV Bypass Lines
|
To
Warm up Ms/CRH/HRH lines
|
|
4
|
100'
|
Drum
Pr= 5ksc
|
Open
LP Bypass 10%
Open
BSVs
Open
HPBP by 10% at Dr Pr=7 ksc
Start
3rd CC pumps at Dr Pr=9 ksc
Take
Additional EF gun ( If Required)
Close
HPBP Warm-up valves
|
Open
1st HPBP Warm-up valves
Close
CRH drain Pot at TG 0m
|
|
Rolling
through SGC
|
|||||
5
|
150'
|
MS =15 ksc/
180-200 Deg
HRH=8 ksc
|
Switch
On start-up Sequence of SGC-turbine
|
TSE
Influence comes ON
|
|
6
|
300'
|
MS =50 ksc/
350 Deg
HRH=8 ksc/350
Deg
Turbine Ready
to Roll
|
Turbine
Speed raised to 360 rpm through SGC sequence
|
Ensure
LO TCV on auto with SP=45 Deg
Gas
Controller on auto
PW
controller on auto
Ensure
closure of Barring valve at 240 rpm
Monitor
TG Vibrations, TSI, Bearing Temp
MS
Pressure/Temp to be maintained upto load 50 MW
|
|
7
|
360'
|
MS =50 ksc/
350 Deg
Turbine at 360
rpm
|
Turbine
Speed raised to 3000 rpm through SGC sequence
|
Check
X6 criteria
Ensure
Tripping of JOP at 540 rpm
Ensure
Tripping of AOP at 2950 rpm
|
|
8
|
370'
|
MS =50 ksc/
350 Deg
Turbine at
3000rpm
|
Switch
Off SGC Program
Put
AVR on auto
Close
Field Breaker
Select
Main GCB
Switch
on Synchroscope after select Check
Synchronise
unit through synchroscope from OWS
Raise
Speed SP by 15 rpm
Close
MAL drains and other HE drains
|
Check
X7 criteria
GT
Cooler Fan starts on auto/ Verify
Load
Ref=50 MW . Pr Max=75 MW
Turbine
Speed will Decrease
|
|
9
|
390'
|
Load=55 Mw
MS Pr=54
ksc/350 Deg
HRH=12 /340 Deg
|
Start
PA Fan, Seal air Fans starts in auto
Take
1st Mill
Start
2nd set of ID/FD Fans
Cut
in LPH-2, 3
Cut
out Deaerator steam from PRDS
Peg
Deaerator form CRH =2 ksc
Cut
in all controllers
|
Open
PAPH FG/Air inlet/outlet Damper Open
PA
Header Pr=800 mmWC,
SA
Disch Hdr=1500 mmWC
|
|
10
|
420'
|
Load=
110
MW
MS=70ksc/370
Deg
|
Charge
PRDS from CRH
Peg
D/A upto 4ksc( gradually)
Cut
in 2nd Mill
Start
withdrawing Oil support
Control
MS/HRH Temp with Burner Tilt and
spray(if Required)
|
Ensure
energizing of Trim Device at 100 MW load
Ensure
Fireball scanners Healthiness
|
|
11
|
440'
|
Load=
160
MW
|