UPS Failure
UPS Failure
CONSEQUENCES OF 240 VOLT UPS SUPPLY FAILURE:-
All LVS supplies from main UPS will not be available but from mini UPS supply will be
available for around 2 hours .
Scanner panel power supply will trip and immediately scanner will sense no
Flame in the Boiler.Unit will trip on flame failure protection. Turbine trips
on MFT & Generator on Low Forward Power.
APH Air Motor will take auto start.
MDBFP scoop will become inoperative from remote.
LLD High level Switch will act
ID fans VFDs air flow relays and its control supply will be Lost and VFD will
trip.
O2 analyser data will not be available
All Drives vibration including the Turbine vibration data will not be available.
ACTIONS TO BE TAKEN DURING 230V UPS SUPPLY FAILURE:-
Ensure start of Turbine AOP at 2850 RPM & otherwise start from local control
panel or through hardwired button in UCB.
Ensure start of JOP at 510 RPM & otherwise start from local control panel or
through hardwired button in UCB.
Ensure opening of barring Gear at 210 rpm.
If possible Maintain Drum Level by operating MDBFP Scoop from local otherwise stop MDBFP and stop all BCWP pumps.
Inform C&I and EMD for restoration of UPS at the earliest.
CONSEQUENCES OF 240 VOLT UPS SUPPLY FAILURE:-
All LVS supplies from main UPS will not be available but from mini UPS supply will be
available for around 2 hours .
Scanner panel power supply will trip and immediately scanner will sense no
Flame in the Boiler.Unit will trip on flame failure protection. Turbine trips
on MFT & Generator on Low Forward Power.
APH Air Motor will take auto start.
MDBFP scoop will become inoperative from remote.
LLD High level Switch will act
ID fans VFDs air flow relays and its control supply will be Lost and VFD will
trip.
O2 analyser data will not be available
All Drives vibration including the Turbine vibration data will not be available.
ACTIONS TO BE TAKEN DURING 230V UPS SUPPLY FAILURE:-
Ensure start of Turbine AOP at 2850 RPM & otherwise start from local control
panel or through hardwired button in UCB.
Ensure start of JOP at 510 RPM & otherwise start from local control panel or
through hardwired button in UCB.
Ensure opening of barring Gear at 210 rpm.
If possible Maintain Drum Level by operating MDBFP Scoop from local otherwise stop MDBFP and stop all BCWP pumps.
Inform C&I and EMD for restoration of UPS at the earliest.