- Reduce Load to 300MW
- Start Unloading corresponding FD fan & increase loading of other FD Fan through blade pitch.
- Check for increase in suction flow & current of Fan (Which is to be kept in service )
- Follow SOP for stopping FD Fan
- After stopping FD Fan ,unload the corresponding ID fan gradually by reducing its IGV & VFD demand. Observe Furnace draught
- Before Stopping the ID fan & Ensure other ID fan got loaded in auto.
- Stop the ID fan once it is unloaded completely
- Close inlet & outlet gate of ID fan if required.
Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
Wednesday, January 1, 2020
Stopping one ID Fan
Subscribe to:
Post Comments (Atom)
-
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
-
Pre-Purging checklist: 1. The generator may be on barring gear or at standstill. Preferably be on barring speed of around 50-80rpm (witho...
-
Volumetrric Vs Gravimetric Mode : Feeder Coal properties constantly vary due to sizing differences and the adverse impact of moisture...
No comments:
Post a Comment