HP & LP Bypass Operation and Protection
HP & LP Bypass Operation and Protection
Purpose
- Boiler operation independent of the turbine
- Minimum steam flow through SH & RH tubes during start-ups, low load operation & sudden unloading of unit
- Utilized or building up of steam parameters
- Avoiding the boiler trip on Reheat protection
- No steam flow through Boiler steam tubes will lead to starvation & thereby overheating and lead to premature failure of tubes
- The capacity of HPLP bypass is 60% of full load turbine steam flow
RH protection (delay=10 sec) will act if
- TURBINE HP V/V & HPBP CLOSED [ either turbine HP stop v/v or HP CV in both HP line closed ] & [ both HP BP <2%] OR
- TURBINE IP V/V & LP BP closed [ Either IP stop v/v or IP CV v/v in both IP line closed ] & [ Either LP BP stop v/v or LP BP C/V in both LP line is closed] OR
- Generator ckt bkr open & [both HP BP closed OR both LP BP closed
- Pump Auto off Oil Press high >160ksc
- Pump Auto on Oil Press Low <120ksc
- Pump Auto off Oil Temp high >70 DegC
- Pump Auto off Oil Level low <18 Lit
- Alarm Oil Press too high >170ksc
- Alarm Oil Press too Low <90ksc
Stg-2 Mode of Operation
- Initial Pressure Mode -Importance to the load
- Fixed Pressure Mode -Importance to the Health of turbine.
BP Valve Priority Close Conditions:
- Condenser Vacuum Low (<-0.6 ksc)
- Bypass Downstream Temp very high (>380 degC)
- Steam Press Controller Switches to Manual from Auto
- spray water valve will close
- This protection will override the Fast opening signal & open push button operation
HP Bypass Fast Opening Conditions
- Generator Circuit Breaker Opening & Boiler on & no priority close
- Turbine Trip & Boiler on & no priority close
- Turbine Load Shedding Relay Operation
- HP BP Pressure Controller Deviation > 8 ksc
- Pressing the Fast Opening Button
BP Valve Auto Blocking Conditions
- Bypass valve priority close command
- BP position transmitter failed
- OSU-1 & 2 Oil Pressure <90 ksc
- Main steam Pressure transmitter failed
BPE Valve Conditions
- Steam Bypass Valves BP1 or BP2<2 % Auto Close Command to ensure positive shut off
- Steam Bypass Valves BP1 or BP2<2 % Spray Water Pressure Control Valve (BD Valve) close
- Steam Bypass Valves BP1 or BP2>2 % Spray Water System (BPE1, BPE2, BD Valve) will switch over to Auto
BPE Valve Auto Blocking Conditions
- Bypass Downstream Temp very high (>380 degC)
- BP auto command blocking
- BPE valve position transmitter failed
- BPE Temp transmitter deviation high
- Therefore, it is necessary to make proper set values for Spray Water Header Pressure & HP BP downstream temperature before operating the Steam Bypass Valves
LP Bypass:
Functions of LP Bypass System are:
- Maintaining minimum Steam Flow through Re-heater
- Maintaining desired Steam Pressure in the Re-heater
- Providing an alternative path for dumping the steam (not accepted by the IP & LP Turbines) into the condenser
LP BP System comprises of :
- Steam Pressure Control Loop
- Valve Position Control Loop
- Automatic Control Interface (ACI)
- Condenser Temperature Protection
- Tracking Unit
Close LP Bypass under following conditions:
- Condenser Vacuum Low (<-0.6 ksc)
- Spray Water Pressure Low (<8 ksc)
- Condenser Wall Temperature High ( > 90 DegC)
- LPBP Down Steam Pressure High (>19 ksc)
- Spray Water valve open command at Steam pressure before bypass valve >6.8 ksc