LIGHT UP CHECK POINTS
BEFORE
LIGHT UP ACTIVITIES
BOILER
SIDE
- DRUM LVLPROTECTION TO BE BYPASSED.
- SEAL TROUGH CHARGED AND BOTTOM ASH HOPPER FILLED.
- ESP FIELDS OFF.
- MAINTAIN WINDBOX TO FURNACE DP PR ABOVE 35MMWC AND PUT SADC IN AUTO.
- HFO TEMP INCREASED TO >100 DEGREE BY INCREASING HFO HEATER SET POINT .
- SCAVENGING OF AB ,CD,EF OIL GUNS TO BE DONE IN ADVANCE BEFORE RESETTING MFT.
- BOILER DRUM, SHVENTS AND SH DRAINS AREOPEN. ALSO BOILER OTHER DRAINS MUST BE IN CLOSE CONDITION.
- APH BLOWERS LINED UP AND OPERATION CHECKED.
- ECO R/C VALVE IS OPEN.
- BOTH BCW ARE RUNNING AND THIRD ONE IS IN AUTO S/B.
- CBD MANUAL AND MOTORISED VALVES ARE OPENED.
- ENSURE LP DOSING P/P AND BOTH CPU I/S.
- PAPH –A AND B FG O/L CONTROL DAMPER CLOSED.
- ALL MILLS LOP FLOW TO BE ENSURED AND HEATERS TO BE I/S AS PER REQUIREMENT
TURBINE
SIDE
- HW/DEAERATOR LVL NORMAL(HW: -150MM, D/A: 450MM)
- SH/RH/HP BYP SPRAY MANUAL V/V SHOULD BE CLOSED.
- MAL DRAINS MANUAL AND ELECTRICAL(11,12,26,22,31,32,27,47,51,52,54,81,55,65)OPENED
- MS STRAINER DRAIN (MSV-101&102) AND HRH STRAINER DRAIN (HRHV105 &106)OPENED
AFTER
LIGHT UP
BOILER
SIDE
- FEED WATER FLOW TO BOILER IS CONTROLLED BY LOW RANGE FRS IN AUTO AND TDBFP DISCHARGE PR>10 KSC FROM DRUM PR.MONITOR EXHAUST HOOD TEMP BELOW 100 DEGREEC AND CHARGE HOOD SPRAY IF REQUIRED.
- DRUM AND SH VENTS CLOSED AT DRUM PR 2 KSC.
- START UP VENT CLOSED(AFTER HPBP AND LPBP CHARGING) AND SH DRAINS CLOSED AFTER 15 KSC DRUM PR.
TURBINE
SIDE
- MAIN TURBINE SEAL STM TEMP INCREASE >240 DEGREE, ATMOSPHERIC DRAIN AT 17M OPENED AND TDBFPS GLAND STM CHARGED AND OPEN EXHAUST V/V.
- VACCUM BREAKER CLOSED AND VACUUM P/P TO BE TAKEN I/S.SEAL STEAM CHARGED AT > -0.20KSC.
- BSV OPENED AND HPBP AND LPBP WARM LINE CHARGED>5KSC DRUM PR.
- LPBP/HPBP CHARGED AT DRUM PR OF >8 KSC.
BEFORE
ROLLING
BOILER
SIDE
- OPEN ANY MILL CAG AND CAD AND PA FAN TAKEN I/S AND OPEN PAPH FG O/L DAMPER.ENSURE ONE SEAL AIR FAN IS RUNNING.
- ONE MILL (A OR C) IS TO BE TAKEN I/S AS PER(TSE) HP TURBINE CASING TEMP.
TURBINE
SIDE
- ENSURE TURBINE IS IN EHTC MODE FROM LOCAL.
- HP/IP TOP/BTM DT TO BE MONITORED.
- DECREASE LUBE OIL TEMP SET POINT FROM 50 TO 45 degC .
- PR SET POINT IN INVENSYS SCREEN TO BE KEPT 50 KSC.
BEFORE
SYNCHRONISATION
- Pr max LOADAND LOAD REF VALUE SHOULD BE REDUCED TO 50 MW.
- HPBP SRAY NORMALISATION AFTER HPBP DOWNSTREAM TEMP >330 DEGREE.
- BEFORE SYNCHRONISATION ONE MILL IS I/S AND ONE MILL HOT AIR CHARGED FOR WARM UP.
AFTER
SYNCHRONISATION
- SH AND RH SPRAY MANUAL V/V OF TDBFP AND MDBFP OPENED
- PW/GAS CNTRL TO BE PUT IN AUTO.
- LPH/DEAERATOR/HPH TO BE CHARGED.
- MAL DRAINS CLOSING.
- ST/UT CHANGEOVER AFTER 100 MW.
- FRS HIGH RANGE TAKEN I/S AT >200 MW BY KEEPING DRUM LEVEL LOW(-150MM).
- OIL GUN WITHDRAWAL AND ESP FIELD CHARGING AFTER FIVE MILLS I/S AND LOAD >300MW.
- BOILER SILICA TO BE MONITORED BEFORE FURTHER LOAD INCREASE.