DG Load Trial and Regular checks
Requirements:
1
|
Inform & Ensure
availability of TMD/EMD/C&I
|
|
2
|
SG/TG/BOP source-2 AC
Power Supply Interruption. Inform C&I for Standby chargers
|
|
3
|
Ensure DG Set Tank Oil
Level Adequate
|
|
4
|
Evacuate and Isolate
Boiler Passenger, Service Building Lift and Isolate. Inform EMD(temporary
supply )
|
|
5
|
Arrange 3 Walky Talky
: 1-CR 2-DG board 3-DG Set room
|
|
6
|
Status
of Unit:
1
|
TG on Barring
|
|
2
|
Generator Depressurized(H2/CO2 Purged out)
|
|
3
|
Seal Oil system in Service
|
|
4
|
All Drives in DG Bus in available condition( Plan
within 1-2 days of Unit shut down)
|
|
5
|
DG Board charged from Normal Incomer Breaker from
Unit Service Board
|
Sequence:
Ø Start
all drives on DG Bus from other standby source(other board)
Ex-
SOP-2 to Sop-1, FD/ID/PA Lop-2 to LOP-1
Ø Start
Main DG set & Note Down: Volatge, RPM, Tank Level, LO Pr/Temp, Battery
Voltage
Ø Trip
Normal Incomer from USS and Close DG set Incoming breaker to charge DG Bus
Ø Start
Loading Drives by starting them which are on DG Bus
Ø Continue
Test run fro ½ -1 Hour.
Normalisation:
Ø Start
all drives on DG Bus from other standby source(other board)
Ø Trip
DG Set Incoming Breaker and Close Normal
Incomer From USS
Ø Switch
Off DG Set
Regular
checks:
Ø DG
Set Fuel Tank Level Normal
Ø DG
Set engine Oil Level Normal
Ø Battery
charger OK
Ø Engine
Coolant level is OK
Ø DG
Set Incomers to DG Bus Healthy