Hydrogen Purging
Ø SLC AS
SOP Off, SLC DC SOP Off, SLC H2 SOP Off
Ø Suppy
of DC SOP Off
Ø Start
one AC SOP ( DP=1.5 ksc)
Ø Dew
Point Air=<-10 Deg, clearance from Chemist
Ø H2
(Isolated Position), CO2(Isolated Position), Air Inlet(Open), Casing vent (
Closed)
Ø After
that, cut out Air supply and Detach Hose of air to Filter
Ø CO2
cylinders in rack, CO2 Flash Evaporator On(SLc made ON), Hot Water Lined up to
Filling room, Pour water on cylinder
Ø Maintain
Manifold Pr=50 ksc
Ø Filling
CO2: H2 (Vent Position), CO2(Inlet Position), Air Inlet(Close), Manitain Co2
(0.3-0.8 ksc) by Casing vent
Ø Continue
Till purity of Co2 comes more than, 99%, Purge other Drier by changeover, Purge
LLD, clearance from Chemist(25-35 Cylinders)
Ø CO2
supply Out: CO2 (Vent Position), H2 (inlet position), Air inlet(Close),
mainatain b/w 0.3 t0 o.8 ksc Pressure by Casing Vent
Ø Continue
Till purity of H2 comes more than, 99%, Purge other Drier by changeover, Purge
LLD, clearance from Chemist: (90-100 Cylinders)
Ø Pressurization:
Co2 (Isolated), H2 (Inlet Position), Air( Closed Position), Casing Vent( Close
): (50-70 cylinders)
Ø Start
H2 SOP when As SOP reaches 4.5 ksc,SLC AS SOP, SLC H2 SOP, DC SOP to be
normalised
Ø Build
Pressure of H2 upto 3.35 ksc, cut out H2 supply
Ø H2(ISolated),
CO2(Isolated), AIr(Close), Casing Vent ( Close)