BEFORE
LIGHT UP ACTIVITIES
BOILER
SIDE
- MAN ,MATERIAL REMOVED AND BOILER IS READY FOR LIGHT UP.
Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
1
|
Inform & Ensure
availability of TMD/EMD/C&I
|
|
2
|
SG/TG/BOP source-2 AC
Power Supply Interruption. Inform C&I for Standby chargers
|
|
3
|
Ensure DG Set Tank Oil
Level Adequate
|
|
4
|
Evacuate and Isolate
Boiler Passenger, Service Building Lift and Isolate. Inform EMD(temporary
supply )
|
|
5
|
Arrange 3 Walky Talky
: 1-CR 2-DG board 3-DG Set room
|
|
6
|
Note Down Initial
Parameters of DG Set |
1
|
At least 2 BCW pump in Serrvice
|
||
2
|
Both SAPH and PAPH Running
|
||
3
|
Turbine : On Barring
(AOP,JOP,SOP, HPCF in service)
|
||
4
|
Generator: PW system, Seal Oil
system, Gas system
|
||
5
|
Condenser Pass : Both Charged
|
||
6
|
PAC & IAC : 1 PAC & 2
IAC in Service
|
||
7
|
CEP & Make-up : 1 CEP with H/W Make-up on auto |