Controlled Fast Cooling Procedure
Controlled Fast Cooling Procedure
- Normally Rihand-II and III 500 MW units take 8-9 days to stop Barring
- Using CFCP, it takes roughy 75 Hours after Desynchronisation.
- It is done in 2 stages.
- First Stage: Unit Parameters Lowered By Reducing Load and steam Parameters.
- Second stage: After Desynchronisation, till 350 Deg( HP Casing Temp), it is to be cooled thru Natural Cooling. thereafter by Modulating HPCV and Vacuum( Forced Cooling) maintaining Drop rate 5-6 Deg/Hour.
- During this : Top/Bottom DT, Differential Expansions, Axial shift, Bearing Temperatures, Bearing & shaft Vibrations need to be Observed and Logged in the sheet and if any Deviation Found, should be rectified.And if these deviations are beyond rectification, then abort force Cooling.
- Ensure all Auto Loops and SLCs in service and MS Temp <480 deg to be bypassed in order to lower Temperature. (Desk, Control Desk, SCE & C&I with Proper logging in Register).
- Start Parameters Reduction Before 6 Hours to shut-down
- First Reduce Load by 5% (25 MW of 500 MW), then stabilise Load and Steam parametrs.
- Then Reduce MS Set point to 525 Deg .( Rate of Reduction of MS Temp :1.5~3 Deg/min)
- Further Reduce Load by 25 MW and stabilise parameters, and after that reduce MS Temp to 515 Deg.(If SH Attemperation in Manual if not maintaning )
- Repeat Above steps, till 300 MW and HP Casing Temp 480 Deg.
- Check HP Exhaust Temp with HP Exhaust Pressure, it should be above Saturation Temp value.
- Do not reduce load and MS Temp together because of DE, Transient vibration, Lower Margin of TSE.
- Open all MAL drains, HP SV/CV, Extraction drains as there may be consensate caused during parameters reduction.
- After HP Casing temp reaches 480 Deg, Desynchronise Machine.
- Ensure AOP, JOP, Barring gear starts as per logic.
- Note down the Coasting down time from 3000 rpm to 510 rpm,210rpm,120 rpm.
Stage II : Controlled Fast Cooling of Turbine
Controlled Fast Cooling by admitting air :