Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
Monday, September 8, 2025
Sunday, September 7, 2025
NTPC dadri Information
NTPC Dadri power plant, also known as National Capital Power Station (NCPS), is a coal and gas-fired thermal power plant located in Uttar Pradesh, India. National Thermal Power Corporation (NTPC) is the project owner.
With a total installed capacity of 2.63GW, the Dadri power plant is one of the biggest thermal power plants in India and the only coal and gas-fired power plant in the country. Of the total power generated, 1,820MW comes from the coal-fired plant and the remaining 817MW from the gas-fired plant.
Friday, September 5, 2025
Dadri S/Y Line loading
NTPC-DADRI TRANSMISSION LINE LOADING
Lines
conductor SIL CA Cent clair stability thermal operation
graph
mw mw limit mw limit mw
Maharanibag 54km 692 2371 2371 5896 1962 1962
Mandaula 1&2
46km
692 2533 2533 6923 1962 1962
Greater Noida 13 km 692
3679 3679 24179 1962 1962
Malerkotla 297 km 517 560 692
811 852 852
Panipat 1&2 112
km 517 1247 1247
2145 852 852
Murad nagar 33 km 517 2143 2143
7280 852 852
DSI SOP
STANDARD OPERATING
PRACTICE (DSI)
NTPC DADRI
STAGE I – 4X210 MW
DRY SORBENT INJECTION SYSTEM
DSI EQUIPMENTS
1. Instrument air compressor
2. Viper mill
3. Oil pump viper mill
4. Blower ( injection and unloading )
5. Dehumidifier ( injection and unloading )
6. Heat Exchanger ( injection and unloading )
7. SBC silo
8. Weigh hopper
9. Rotary air lock ( RAL )( Injection and unloading )
10. Rotary vane feeder ( RVF )
11. Jumbo bag hopper
12. Splitter
Dadri-1: Mill c/o guidelines
Mill starting procedure :
·
Clearance from local
operator is to be recorded before starting mill.
·
Ensure feeder coal on belt
is established.
·
Ensure ignition permit is available.
·
Open bunker outlet &
feeder inlet gate.
·
Start Mill LOP and observe
lub oil pressure , temperature and flow.
·
Open CAG ( CADshould be
closed), monitor PA header pressure.
·
Start Mill and monitor its
current (60-65 Amp normal current).
·
Open feeder seal air valve
& feeder outletgate.
·
Open HAG,( HAD should be
closed), monitor PA header pressure.
·
Observe boiler flame
intensity during mill operation.
Dadri: biomass Operating Procedure
1)
Mill Operating Parameters and
Operation procedure: -
Ø
Maintain
Mill outlet temperature-> 55 C
Ø
Mill
inlet temperature -> not more than 180 C
Ø
Observe
all 4 coal pipe temperature of Mills with biomass regularly. In case of any
deviation from rest of the pipes (any abrupt rise or fall), stop the mill and
give PTW for inspection.
Ø
Pre
start and post shutdown purging of mill is mandatory.
Ø
Continuous
monitoring of mill parameters most importantly mills inlet air temperature, mill
outlet temperature, mill current and mill DP.
Ø
Mill
inlet temperature should not be more than 180 C in any case
Ø
Mill
reject system to be kept under observation continuously
Ø
Operator
should be deployed at local for monitoring in wake of fire hazard.
Ø
In
case of fire, mill should be tripped and steam inerting should be done
immediately by opening steam interting motorized valve, keeping watch on
furnace pressure. Fire tender may also
be used if required.
Ø
Clinkering
and slagging tendency to be observed from local as well as from rise in SH zone
FG temperature. Soot blowing and LRSB to be done accordingly.
Dadri-1: Boiler Safety valve float data
BOILER SAFETY VALVES FLOATING PROTOCOL.
UNIT DATE:
|
S.NO. |
VALVE NO. |
DESIGN PR.(KSC) |
ACTUAL PR.(KSC) |
||
|
|
|
OPERATING PR. |
RESET PR. |
OPERATING PR. |
RESET PR. |
|
1 |
SV-1 |
176 |
169.3 |
|
|
|
2 |
SV-2 |
179.9 |
170.9 |
|
|
|
3 |
SV-3 |
181.7 |
172.6 |
|
|
|
4 |
SV-4 |
163 |
158.1 |
|
|
|
5 |
SV-5(ERV-1) |
161.4 |
158 |
|
|
|
6 |
SV-6(ERV-2) |
161.4 |
158 |
|
|
|
7 |
SV-7 |
49 |
46.6 |
|
|
|
8 |
SV-8 |
46.3 |
44.0 |
|
|
|
9 |
SV-9 |
46.66 |
44 |
|
|
|
10 |
SV-10 |
48.42 |
46.0 |
|
|
|
11 |
SV-11(ERV-3) |
45.8 |
44.9 |
|
|
|
12 |
SV-12(ERV-4) |
45.8 |
44.9 |
|
|
Dadri-1: DOR
DOR OF HT/LT MOTORS
CONVENTION:
DOR TAKEN
FROM NDE SIDE OF MOTOR
C: CLOCKWISE A: ANTI CLOCKWISE
HT MOTORS
|
ID A/B |
A |
MILL
A/B/C/D/E/F |
C |
PA A |
C |
|
FD A /B |
A |
ECW A/B/C |
C |
PA B |
A |
|
CEP A/B |
C |
BFP
A//B/C |
C |
CW A/B |
A |
|
|
|
|
|
TAC A/B |
C |
LT MOTORS
1. BOILER
|
ID LOP-A/B |
C |
FEEDER MAIN MTR |
C |
|
ID AOP A/B |
C |
FEEDER
COC MTR |
C |
|
FD LOP A/B |
C |
SCANNER
FAN AC |
C |
|
PA LOP
A/B |
C |
SCANNER
FAN DC |
C |
|
PA AOP
A/B |
C |
SEAL AIR
FAN A/B |
A |
|
MILL LOPA/B |
C |
APH A
MAIN MTR |
A |
|
APH GB
LOP A/B |
C |
APH A S/B
MTR |
A |
|
APH SB
LOP A/B |
C |
APH B
MAIN MTR |
C |
|
|
|
APH B S/B
MTR |
C |
Dadri-1: after Shutdown Activities
ACTIVITIES AFTER UNIT SHUTDOWN (SHORT SHUTDOWN 8Hrs TO
72 Hrs) STAGE-1
1. After closing MS-1 & 2, isolate electrical supply.
2. Before killing Vacuum,
a) open MS & HRH line drains to IBD
b) close all drains to flash box and condenser
c) Open HPBP line drain lines at 8.5 M.
d) MS line is depressurized.
Dadri -1: Reserve Shutdown Procedure
PROCEDURE FOR
RESERVE SHUT DOWN OF STAGE-1 UNITS
PREPARATIONS
1. Open the seal steam drain v/v, MAL-81 and ensure the temp. above 230 deg before seal steam controller,
2. Put the oil guns of AB & CD elevation in scavenge.
3. Open the manual isolating v/v of CBD line at 19 M & 3.5 M.
4. Get the reqd. protections bypassed by C&I engr.
5. Close the Aux. PRDS if in service. (Close As-11, AS-12).
6. Close HT hdr isolating valve at Deaerator floor.
7. Inform CHP , AHP & Switchyard c/r regarding shut down plan.
8. Note down the HFO counter reading.
Dadri-1: Pre-lightup checklist
Light up preparation Checklist
BOILER SIDE
1. Deployment of CISF person(IOM & information to CISF)(one person for Blr & Tur. Each)
2. Ensure opening of manual isolating v/v of following
a. CBD
b. IBD
c. MS-203 MS-204
d. HRH-203,HRH-204
e. IBD side drains of MS & HRH LINE
f. Boiler vents
g. SH vents
h. SH Hdr. drains
i. Isolating valves of ERV’s
j. Boiler startup vent
Wednesday, September 3, 2025
Wednesday, February 28, 2024
Tuesday, January 30, 2024
Dadri stage-1 Light up Preparation
LIST OF ACTIVITIES AFTER UNIT LIGHT UP
(WARM/HOT START UP AFTER TUBE LEAKAGE)
Dadri stage-1 after Light up checklist
LIST OF ACTIVITIES AFTER UNIT LIGHT UP
(WARM/HOT START UP AFTER TUBE LEAKAGE)
Dadri stage-1 After shutdown Work
ACTIVITIES AFTER UNIT SHUTDOWN (SHORT SHUTDOWN 8Hrs TO
72 Hrs) STAGE-1
1. After closing MS-1 & 2, isolate electrical supply.
-
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
-
Generator Air Tightness Test Period Of Test= 24 Hrs without a Break Air Pressure Drop (Allowed in 24 Hrs) : <=0.15 ksc Air Test Pre...