NTPC-DADRI TRANSMISSION LINE LOADING
Lines
conductor SIL CA Cent clair stability thermal operation
graph
mw mw limit mw limit mw
Maharanibag 54km 692 2371 2371 5896 1962 1962
Mandaula 1&2
46km
692 2533 2533 6923 1962 1962
Greater Noida 13 km 692
3679 3679 24179 1962 1962
Malerkotla 297 km 517 560 692
811 852 852
Panipat 1&2 112
km 517 1247 1247
2145 852 852
Murad nagar 33 km 517 2143 2143
7280 852 852
SIL- SURGE IMPEDENCE
LOADING
NTPC-DADRI
(4*210 +2*490 THERMAL + 830 MW GAS + 5 MW SOLAR )( SWITCHYARD 220/400KV ,5*500
MVA)
OUT
GOING 400 KV TRANSMISSION LINES
DADRI------13KM-------àG,NOIDA(UP)(3*315+1*500MVA)----------22KM-àNAVADA(UP)-------21kmà BALLABGARH(PG)
DADRI-------54km------à MAHARANIBAGH(PG)(2*315+2*500MVA)---- 61KM---à BALLABGARH (PG)(11
LINES)(5*315MVA)
DADRI------33KM-------à MURAD NAGAR(UP)(3*315MVA)( 4LINES TO RISHIKESH/KANPUR/ALIGARH/DADRI)
DADRI------117KM---TWO
LINES---àPANIPAT 1&2(BBMB) (2*450MVA)(3
LINES- 2 FROM DADRI+1 FROM
DADRI------297KM-----àMALERKOTLA(PG)(2*315+1*500MVA)(3 LINES FROM PATIYALA/LUDHIANA/DADRI)
DADRI-----
44KM---TWO LINES----àMANDAULA 1&2 (PG)
(4*315MVA)(8LINES,4TO
DADRI------54KM---TWO
LINES----à LONI OR HARSH VIHAR 1 &2(UP) (
2*315 MVA) ( 2 LINES FROM DADRI ONLY )
DADRI—400KV BUS 1&2 TO HVDC(PG)----à 2*750 MW HVDC BIPOLE LINE 815 KM TO RIHAND THERMAL