INSTRUMENT AIR FAILURE
|
NCPS Stage-2 (2X490
MW)
|
·
As Recirculation valves of both TDBFPs will
open, immediately start MDBFP and Load it to maintain drum level. Reduce load
to around 350 MW.
·
As Recirculation valves of CEPs will open,
keep third CEP also in service.
·
Take all pneumatic control valves in manual
and match command with feedback before instrument air pressure is restored to
avoid command going to 0% or 100%.
|
Boiler side
|
Area
|
Valve/Gate/Damper
|
Type
|
Status
|
action
|
FIRING FLOOR
|
HOTV
|
AIR
TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
Stop
HFO/LDO pump if Header pressure is not maintained
|
LOTV
|
AIR
TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
HORV
|
AIR TO CLOSE
|
Will Open
|
|
HONV
|
AIR TO OPEN
|
Will close
|
|
LONV
|
AIR TO OPEN
|
Will close
|
|
HFO PR CV
|
AIR
TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
LDO PR CV
|
AIR
TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
Atomising Steam CV
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
FOPH
|
LDO recirculation v/v
|
AIR TO CLOSE WITH ALR
|
Will
open if there is any leakage.
|
|
HFO recirculation valve
|
AIR TO CLOSE WITH ALR
|
Will
open if there is any leakage.
|
|
HFO cooler cv
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
HFO htr stm cv
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
SH Spray
|
Main block Valve
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage, MS temp will rise
|
Control temperature by unloading top mills
|
Line block valve
|
AIR TO OPEN WITH ALR
|
Control valve
|
AIR TO OPEN WITH ALR
|
RH Spray
|
Main block Valve
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage, HRH Steam temp will rise
|
Control temperature by unloading top mills
|
Line block valve
|
AIR TO OPEN WITH ALR
|
Control valve
|
AIR TO OPEN WITH ALR
|
Burner Tilt
|
Burner Tilt
|
DOUBLE ACTING WITH ALR
|
Burners will go down if there is any air
leakage.
|
|
APH
|
Air motor
|
Available
|
If
NRV is healthy Air motor will run for
around 30 min.
|
|
PAH FG O/L damper
|
DOUBLE ACTING WITH ALR
|
May
open or close slowly if there is any leakage from cylinder.
|
|
SAH FG O/L damper
|
DOUBLE ACTING WITH ALR
|
May
open or close slowly if there is any leakage from cylinder.
|
|
SADC
|
SADC
|
STAYPUT
|
|
Monitor
windbox/furn DP/
Monitor
air flow/ FD fan current/Furnace pr.
|
MILLS
|
HAG (V)
|
DOUBLE ACTING
|
May
close if NRV is passing
|
Stop
feeders if PA flow to mill reduces
|
CAG(V)
|
DOUBLE ACTING
|
May
close if NRV is passing
|
HAD
|
DOUBLE
ACTING WITH ALR
|
May
open or close slowly if there is any leakage from cylinder.
|
CAD
|
DOUBLE ACTING WITH ALR
|
May
open or close slowly if there is any leakage from cylinder.
|
Mill seal air valve
|
DOUBLE ACTING
|
STAYPUT
|
|
Feeder SEAL AIR VALVE
|
DOUBLE ACTING
|
STAYPUT
|
|
FEEER O/L GATE
|
DOUBLE ACTING
|
STAYPUT
|
|
Seal Air Fans
|
SEAL AIR FAN S/V
|
DOUBLE ACTING
|
STAYPUT
|
|
SEAL AIR FAN D/V
|
DOUBLE ACTING
|
STAYPUT
|
|
Scanner air fan
|
SCANNER AIR FAN D/V
|
DOUBLE ACTING
|
STAYPUT
|
|
SCANNER AIR EMERGENCY SUCTION DAMPER
|
DOUBLE ACTING
|
STAYPUT
|
|
Soot blowing
|
SB CV
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
BCW pump
|
BCW cavity ECW emergency v/v
|
close
|
|
|
BCW cavity ECW drain v/v
|
close
|
|
|
SCAPH
|
SCAPH
STEAM CV
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turbine side
|
Hotwell & D/A
|
Hotwell Lvl
CV
|
AIR TO CLOSE WITH ALR
|
|
Isolate normal makeup control valve
|
Emergency make up valve
|
AIR TO OPEN WITH ALR
|
|
Maintain hotwell level by bypass valve
|
D/A LVL
CV
|
DOUBLE ACTING WITH ALR
|
May
open or close slowly if there is any leakage from cylinder.
|
·
Start third CEP
·
Maintain de-aerator level
by motorised bypass valve.
·
Close D/A over flow manual valve.
·
Monitor condensate flow & maintain load accordingly
|
D/A overflow
|
AIR TO CLOSE
|
Will
Open
|
GSC R/C valve
|
AIR TO CLOSE WITH ALR
|
Will
open if there is any leakage.
|
CEP R/C valve
|
AIR TO CLOSE
|
Will
Open
|
Gland seal CV
|
|
|
|
CPU
|
|
|
|
BFP
|
BFP R/C
valve
|
AIR TO CLOSE
|
Will
Open
|
Start MDBFP and maintain drum level.
|
FRS CV
|
DOUBLE ACTING WITH ALR
|
May
open or close slowly if there is any leakage from cylinder.
|
|
TDBFP GS SUPPLY CV
|
AIR TO CLOSE WITH ALR
|
|
lube oil temperature
|
TDBFP GS LEAKOFF CV
|
AIR TO OPEN WITH ALR
|
|
Monitor TDBFP gland seal pr & maintain by
its bypass v/v
|
TDBFP Lube oil Temp CV
|
AIR TO CLOSE WITH ALR
|
|
|
HPH
|
HPH normal drip
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
Monitor HPH & LPH level
|
HPH
drip to flash box
|
AIR TO CLOSE WITH ALR
|
Will
open if there is any leakage.
|
|
LPH
|
LPH normal drip
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage.
|
|
LPH
drip to flash box
|
AIR TO CLOSE WITH ALR
|
Will
open if there is any leakage.
|
|
PRDS
|
PRDS CV
|
close
|
|
|
Vacuum pump
|
Vacuum pump SIV
|
AIR TO OPEN WITH ALR
|
Will
close if there is any air leakage
|
If
SIV closes, watch vacuum, Confirm turbine should trip on low vacuum
|
MOT
|
Centrifuge 3way valve
|
bypass
|
|
Stop Centrifuge
|
Turbine
|
HPT evacuation valve
|
AIR TO OPEN
|
Will
remain close and become inoperative.
|
|
|
|
|
|
|
|
|