Thursday, September 4, 2025

Dadri-1: Boiler Safety valve float data

 

              BOILER SAFETY VALVES FLOATING PROTOCOL.


UNIT                                                                                                              DATE:

 

S.NO.

VALVE NO.

DESIGN PR.(KSC)

ACTUAL PR.(KSC)

 

 

OPERATING PR.

RESET PR.

OPERATING PR.

RESET PR.

1

SV-1

176

169.3

 

 

2

SV-2

179.9

170.9

 

 

3

SV-3

181.7

172.6

 

 

4

SV-4

163

158.1

 

 

5

SV-5(ERV-1)

161.4

158

 

 

6

SV-6(ERV-2)

161.4

158

 

 

7

SV-7

49

46.6

 

 

8

SV-8

46.3

44.0

 

 

9

SV-9

46.66

44

 

 

10

SV-10

48.42

46.0

 

 

11

SV-11(ERV-3)

45.8

44.9

 

 

12

SV-12(ERV-4)

45.8

44.9

 

 

 

 

 

 

BMD                                                                                       OPERATION

 

 

SIGN                                                                                      SIGN

 

NAME                                                                                                NAME

 

DESIG.                                                                                   DESIG

 

No comments:

Post a Comment

Dadri S/Y Line loading

                                                        NTPC-DADRI TRANSMISSION LINE LOADING   Lines                          conductor ...