Dadri stage-1 start up tables

 

TURBINE START UP TABLES(210 MW)

 

Dadri stage-1 start up & shutdown Checklist

 

Unit Shutdown Checklist

Dadri stage-1 Hot start up

 

After shut down

 

Dadri stage-1 Light up Preparation

 

LIST OF ACTIVITIES AFTER UNIT LIGHT UP

(WARM/HOT START UP AFTER TUBE LEAKAGE)

Dadri stage-1 after Light up checklist

 

LIST OF ACTIVITIES AFTER UNIT LIGHT UP

(WARM/HOT START UP AFTER TUBE LEAKAGE)

Dadri stage-1 After shutdown Work

 

ACTIVITIES AFTER UNIT SHUTDOWN (SHORT SHUTDOWN 8Hrs TO 72 Hrs) STAGE-1

1.       After closing MS-1 & 2, isolate electrical supply.

Dadri Stage-1 Start up Write-up

 

SOP to avoid unit disturbance/tripping during litup/turbine rolling/unit synchronization

1.    APH oil carryover probe to be checked hourly during light up. Oil gun having poor flame to be removed. APH soot blowing to  continue till oil guns in service. CBD to be opened after boiler litup and closed as per chemistry clearance. SCAPH charging &Dearator heating / pegging to be done . Condensate dumping to be done.

Dadri stage-1 Turbine Interlock & Protection

 Dadri stage-1 Turbine Interlock & Protection

  • Lub Oil Pr: Alarm=2.0 ksc. Trip=1.88 ksc Effect: Turbine Trips, Barring gear Protection Close,Vacuum Breaker Opens