Pre-Purging checklist: 1. The generator may be on barring gear or at standstill. Preferably be on barring speed of around 50-80rpm (without condenser vacuum). At least 60 CO2 filled cylinders should be available in the unit where purging is to be done. Arrangement for filling hot water on CO2 cylinder / lines (to avoid freezing) is to be ready.