Hydrogen Purging

Pre-Purging checklist:

1. The generator may be on barring gear or at standstill. Preferably be on barring speed of around 50-80rpm (without condenser vacuum).
 At least 60 CO2 filled cylinders should be available in the unit where purging is to be done.
 Arrangement for filling hot water on CO2 cylinder / lines (to avoid freezing) is to be ready.

Loss of Instrument Air

Loss of Instrument Air
Anticipated Problems:

1. No oil burner can be taken in service. Oil guns, oil/steam valves will remain inoperative.
The igniter will not get advance.

Vacuum Pulling Process

Vacuum Pulling Process
1 Ensure permit cancellation on Vacuum pump/Flash Tank related MOV/Condensate system & Clearance for vacuum pulling.

Mill Fire

Mill Fire
a) Fire in mill under shut down:
 Isolate the mill totally from air side by closing cold/hot air dampers & gates and mill seal air valves.

Shutdown Instructions

Shutdown Instructions
1 Ensure UT change over before tripping of boiler/ turbine.
2 Ensure 400 KV breaker are opened after unit tripping.

UPS Failure

UPS Failure

CONSEQUENCES OF 240 VOLT UPS SUPPLY FAILURE:-

 All LVS supplies from main UPS will not be available but from mini UPS supply will be
available for around 2 hours .

Boiler forced Cooling

Boiler Forced Cooling

1 In case of Tube leakage

1.1 After Tripping the boiler ,stop FD fan and keep ID fan running at
minimum load and ensure furnace pressure negative inside boiler.

CC(BCW) Pump Isolation & Purging

CC(BCW) Pump Isolation & Purging

1. ISOLATION OF CC PUMP REMARKS

1.1 Remove from Stand by mode if it is in auto
1.2 Stop CC pump if running

Bunker fire : Prevention

Bunker fire

PREVENTION OF BUNKER FIRE

 Ensure Feeder outlet gate closes on auto when Feeder stopped/tripped. Otherwise give