Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
Saturday, May 30, 2020
Friday, May 22, 2020
Hydrogen Purging
Pre-Purging checklist:
1. The generator may be on barring gear or at standstill. Preferably be on barring speed of around 50-80rpm (without condenser vacuum).
At least 60 CO2 filled cylinders should be available in the unit where purging is to be done.
Arrangement for filling hot water on CO2 cylinder / lines (to avoid freezing) is to be ready.
1. The generator may be on barring gear or at standstill. Preferably be on barring speed of around 50-80rpm (without condenser vacuum).
At least 60 CO2 filled cylinders should be available in the unit where purging is to be done.
Arrangement for filling hot water on CO2 cylinder / lines (to avoid freezing) is to be ready.
Loss of Instrument Air
Loss of Instrument Air
Anticipated Problems:
1. No oil burner can be taken in service. Oil guns, oil/steam valves will remain inoperative.
The igniter will not get advance.
Anticipated Problems:
1. No oil burner can be taken in service. Oil guns, oil/steam valves will remain inoperative.
The igniter will not get advance.
Thursday, May 21, 2020
Vacuum Pulling Process
Vacuum Pulling Process
1 Ensure permit cancellation on Vacuum pump/Flash Tank related MOV/Condensate system & Clearance for vacuum pulling.
1 Ensure permit cancellation on Vacuum pump/Flash Tank related MOV/Condensate system & Clearance for vacuum pulling.
Mill Fire
Mill Fire
a) Fire in mill under shut down:
Isolate the mill totally from air side by closing cold/hot air dampers & gates and mill seal air valves.
a) Fire in mill under shut down:
Isolate the mill totally from air side by closing cold/hot air dampers & gates and mill seal air valves.
Shutdown Instructions
Shutdown Instructions
1 Ensure UT change over before tripping of boiler/ turbine.
2 Ensure 400 KV breaker are opened after unit tripping.
1 Ensure UT change over before tripping of boiler/ turbine.
2 Ensure 400 KV breaker are opened after unit tripping.
UPS Failure
UPS Failure
CONSEQUENCES OF 240 VOLT UPS SUPPLY FAILURE:-
All LVS supplies from main UPS will not be available but from mini UPS supply will be
available for around 2 hours .
CONSEQUENCES OF 240 VOLT UPS SUPPLY FAILURE:-
All LVS supplies from main UPS will not be available but from mini UPS supply will be
available for around 2 hours .
Boiler forced Cooling
Boiler Forced Cooling
1 In case of Tube leakage
1.1 After Tripping the boiler ,stop FD fan and keep ID fan running at
minimum load and ensure furnace pressure negative inside boiler.
1 In case of Tube leakage
1.1 After Tripping the boiler ,stop FD fan and keep ID fan running at
minimum load and ensure furnace pressure negative inside boiler.
CC(BCW) Pump Isolation & Purging
CC(BCW) Pump Isolation & Purging
1. ISOLATION OF CC PUMP REMARKS
1.1 Remove from Stand by mode if it is in auto
1.2 Stop CC pump if running
1. ISOLATION OF CC PUMP REMARKS
1.1 Remove from Stand by mode if it is in auto
1.2 Stop CC pump if running
Bunker fire : Prevention
Bunker fire
PREVENTION OF BUNKER FIRE
Ensure Feeder outlet gate closes on auto when Feeder stopped/tripped. Otherwise give
a close command for closing.
PREVENTION OF BUNKER FIRE
Ensure Feeder outlet gate closes on auto when Feeder stopped/tripped. Otherwise give
a close command for closing.
Tuesday, May 19, 2020
Subscribe to:
Comments (Atom)
-
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
-
Generator Air Tightness Test Period Of Test= 24 Hrs without a Break Air Pressure Drop (Allowed in 24 Hrs) : <=0.15 ksc Air Test Pre...