| BCW Pump | ||||||||||
| STARTING THE BCW PUMP : - | ||||||||||
| F.1 PRE START CHECKS BEFORE INITIAL STARTING OF THE PUMP | ||||||||||
| 1 Boiler Drum is filled & drum level is maintained on positive side (+200 mm) for starting first | ||||||||||
| pump. | ||||||||||
| 2 SGECW System & BCW Booster Pump is in service. | ||||||||||
| 3 Emergency over head tank level OK. | ||||||||||
| 4 Ensure that pump & pump cooler is completely vented. | ||||||||||
| 5 Start permissive is available. | ||||||||||
| 6 LP cooling water valves are open and the cooling water flow is > 75 LPM. | ||||||||||
| 7 All other valves must be closed. | ||||||||||
| 8 LP & HP purge lines are charged and purge line valve to motor is in closed condition. | ||||||||||
| 9 Check for any water leakage from pump instruments, cooler vent, pump & motor assembly. | ||||||||||
| 10 With water filled, the insulation resistance measured at the terminal links, using a 1000V | ||||||||||
| megger must exceed 200 mega ohms. | ||||||||||
| START PERMISSIVE | ||||||||||
| 1 No Switchgear disturbance. | ||||||||||
| 2 Switchgear Available | ||||||||||
| 3 Drum N2 Vent Valves Closed. | ||||||||||
| 4 Motor Cavity Temp Not high (57° C). | ||||||||||
| 5 Suction Manifold / Casing DT not high (< 38° C). | ||||||||||
| 6 BCW P/P Cooling Water Flow Adequate (> 75 LPM). | ||||||||||
| 7 BCW P/P Not Tripped. | ||||||||||
| 8 Both Discharge v/v Stem open. | ||||||||||
| 9 When a boiler is started from cold, a minimum of two BCW pumps must be operated. It is | ||||||||||
| normal practice to start all the three pumps before boiler light up | ||||||||||
| Starting of pumps | ||||||||||
| 1 Start the first pump | ||||||||||
| 2 Motor current will drop from full starting current after few seconds to normal & there is no | ||||||||||
| hunting in current. | ||||||||||
| 3 Ensuring Drum level is normal start second pump (after starting of pump it tends to dip). | ||||||||||
| 4 Differential pressure should rise immediately to approx. 3.1 kg/sec². | ||||||||||
| 5 Check with local operator about any abnormal sound from pump. | ||||||||||
| 6 Ensure for the standby pump that DT between pump casing & boiler water is within 56° C. | ||||||||||
| 7 Caution –If motor fails to start after 5 seconds, press stop button & do not attempt to | ||||||||||
| start the pump for 20 minutes. | ||||||||||
| FOR STANDBY BCW PUMP: | ||||||||||
| 1 Close the service valve in pump jumper line & open the pump discharge by-pass valve. This | ||||||||||
| ensures that as the boiler heats up, a flow passes from the discharge legs to the pump case & | ||||||||||
| impeller. | ||||||||||
| 2 Check the motor cavity temperature is not exceeding 49 ° C. | ||||||||||
| 3 In such a case take the pump in service & close pump discharge by-pass valve & open the | ||||||||||
| pump jumper line service valve. | ||||||||||
| ISOLATION PROCEDURE | ||||||||||
| There is no provision to isolate the pump in boiler lighted up condition as no isolation | ||||||||||
| v/v is provided in suction line, only two manual v/v are provided in the two discharge | ||||||||||
| lines. | ||||||||||
| PROTECTIONS | ||||||||||
| 1 PUMP Motor Cavity Temperature Very High with a time delay of 5 sec (> 60 ° C). | ||||||||||
| 2 Discharge Valve Stem-1 not open | ||||||||||
| 3 Discharge Valve Stem-2 not open | ||||||||||
Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
Thursday, May 10, 2018
BCW Pump
Subscribe to:
Post Comments (Atom)
-
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
-
Generator Air Tightness Test Period Of Test= 24 Hrs without a Break Air Pressure Drop (Allowed in 24 Hrs) : <=0.15 ksc Air Test Pre...
No comments: