Low pressure ash water system caters water at the following areas (BALP pumps): | |||||||||||||||
1. Ash slurry sump makeup. | |||||||||||||||
2. Ring header for seal trough makeup / flushing. | |||||||||||||||
3. Refractory cooling supply. | |||||||||||||||
4. Bottom ash hopper makeup / filling. | |||||||||||||||
5. Bottom ash hopper window spray. | |||||||||||||||
6. Make up to overflow settling bin. | |||||||||||||||
High pressure water pump caters water at the following areas (BAHP pumps): | |||||||||||||||
1. Jet pump fitted below the clinker crusher at the bottom ash hopper. | |||||||||||||||
2. Jetting water requirement for bottom ash hopper. | |||||||||||||||
3. HP line water supply to feeder ejector and slurry box of economizer and economizer | |||||||||||||||
bypass system. | |||||||||||||||
4. HP line to economizer ash transfer hopper for jetting purposes. | |||||||||||||||
5. HP line to jet pump fitted below the economizer ash transfer hopper. | |||||||||||||||
6. HP line bypass connection to bottom ash hopper refractory cooling water and ring | |||||||||||||||
header for seal trough make up / flushing water line. | |||||||||||||||
7. Flushing connections to bottom ash hopper overflow weir boxes. | |||||||||||||||
8. Line for flushing sludge pump discharge lines. | |||||||||||||||
Flushing water pump: | |||||||||||||||
1. The flushing water pumps are provided for slurry disposal line flushing purpose. | |||||||||||||||
Sump jetting water pumps caters at the following areas: | |||||||||||||||
1. Ash slurry sump jetting. | |||||||||||||||
2. Common ash slurry trough jetting arrangement. |