In stage 1 we have two station transformers
(ST1 and ST2). In case of planned outage or emergency tripping of one station
transformer the station bus of that station transformers can be charged via
available station transformer
Case 1 : Charging of station bus SC bus via station bus SA
- Open Station transformer 1
& 2 scheme in station common OWS (fig (i))
- See which breaker among
CBE 213 and CBE 217 is in closed condition. In normal condition one breaker
(CBE 213 or CBE 217) must be in closed condition.
- If CBE 213 is in closed
condition then
a)
Select Breaker CBE 216 ( SC incomer from ST#2) in SA-SC trip selector. (fig (i))
b)
Turn the common synchronizer switch on common electrical vertical panel to check mode (fig (ii))
c)
Put Synchroscope (on common electrical vertical panel ) in ON mode (fig (iii))
d)
Select breaker CBE 217 (SC tie from SA) and check its permissive
e)
After ensuring all the permissive are coming ,
close breaker CBE 217
f)
After closing of CBE 217(SC tie from SA) breaker CBE 216 ( SC incomer from ST#2) will open in auto and SC bus will get charged
by SA bus