TDBFP LOP protection and Auto Start
1. LOP A running if trips, LOP B takes start
2. LOP A running and LO dis Hdr manifold pr LT 8.4 ka, LOP takes start
3. LOP A running and LO dis pr at brg inlet LT 1.8 ka, LOP B takes start
4. If LO dis Pr at Brg inlet LT 1 ka, DCEOP starts