COLTCS OPERATION
COLTCS OPERATION
Filling the system with water
Filling the system with water
- Ensure that screens are in backwash position.
- Open manually operated isolating ball valves 2 no. each provided in ball extraction and ball injection pipe lines for filling the pipes and pump with water.
- Open vent valve of Ball collector vessel.
- When water flows out of the vent, close the vent valve.
- Ensure that Ball vessel inlet and outlet valves are close.
- Open vent valve of Ball vessel.
- Open drain valve of ball vessel till water level in ball vessel falls to 50%.
- Open hand hole of ball vessel
- Introduce & squeeze cleaning balls (Blue - 300) under water to remove air until the balls sink below surface of water.
- Close hand hole of ball vessel.
- Close vent valve when water starts flowing freely from the vent.
- System is properly filled with water and completely vented.
- Ball vessel inlet and outlet valves are close.
- Screens are in ‘Operating Position’.(i.e Screen valves are in closed condition )
- Both C.W. pumps are running and there is adequate flow through the condenser.
- Differential Pressure across screens is < 30 mbar
- Start Ball Re-circulation pump from UCB
- Open Ball vessel inlet valve
- After 5 minutes of inlet valve opening, open ball vessel outlet valve.
- Run the system in operation mode for 60 mins (adjustable). After completion of 60 mins (adjustable), Run the sytem in collection mode (Open Ball vessel bypass valve & close ball vessel outlet valve). After this , the above process is to be repeated till 8 hr ( adjustable ).
- After 8 hr of continuous operation & collection mode , Run the system in Collection mode for 4 hr. Then it is to be put in backwash mode (2 no. outlet screen to be opened). Stop Ball recirculation pump. Ball counting is to be done jointly with TMD/OPN for checking effectiveness of screen.
- If at any point DP is greater than 30 mbar , Back wash mode to be operated immediately.