BCW Fill & Purge
BCW Fill & Purge
ISOLATION OF CC PUMP
ISOLATION OF CC PUMP
- Remove from Stand by mode if it is in auto
- 1.2 Stop CC pump if running
- Isolate it Electrically
- Close both discharge valve of CC pump if boiler is to be drained.
- Isolate the inlet & outlet manual valve of LP cooler
- Ensure the water flowmeter reading of LP coolercooler shows zero value.
- Ensure the Unit is under Shutdown
- Ensure that the Suction Manifold temp. is less than 100 deg C.
- Close both discharge valve of all CC pumps.
- Drain the Boiler
- Open the pump casing vent of all CC pumps.
- After water stops coming from all pump casing vent, then open the pump casing drain.
- Ensure that the cavity is completely drained.
- Ensure the following :
- Electrical Isolation of CC pump
- Both Discharge valve closed
- Boiler is in drained condition.
- Ensure both manual valves (just before entering pump cavity ) for filling pump cavity are in close condition so that water does not enter pump cavity.
- Ensure DM Make up pump is running.
- Open the basket strainer drain
- Ensure the supply valve from BFP discharge is close and open the supply valve from DM make up pump to basket strainer.
- Flushing is to be carried out from basket strainer drain until clean water starts coming out.
- Open the fine filter drain valve& close the basket strainer drain valve
- Line Flushing to be carried out from fine filter drain valve until clean water starts coming out
- Open the final drain valve just before entering BCW pump cavity& close the fine filter drain valve.
- Line Flushing is to be carried out from drain valve just before entering pump cavity until clean water starts coming out & conductivity is less than 1 μs/cm.
- Inform Chemistry to keep measuring conductivity of water on hourly basis until three consecutive readings of conductivity less than 1 μs/cm is achieved.
- Adjust the flow rate of water coming out of drain to 5 LPM after chemistry clearance. (After three consecutive reading , conductivity less than 1 μs/cm )
- Open the casing vent of all pumps & both the manual valves for cavity filling. Close the drain valve.
- When water starts coming out from pump casing vent, measure the conductivity of water.
- On Achieving three consecutive readings of conductivity less than 1 μs/cm, pump casing vent & cavity filling line manual valves are to be closed.
- Close main supply valve from DM make up pump (For Purge & filling)
- Inform EMD for Motor Meggering.Take Electrical Clearance before starting pump.
- Open Both discharge valves of CC pump after drum filling.
- Normalize cooling water isolation valves & note down the cooling water flow rate of LP & cooler.
- BCW pump can be started & observe its cavity temperature
WHEN DO I NEED TO PURGE THE CAVITY OF CC PUMP OF AN UNIT COMMISSIONED 4 YEARS AGO?
ReplyDeleteDO I NEED TO PURGE THE CAVITY IN A SHUTDOWN OF ONE WEEK FOR BOILER TUBE LEAKAGE
?