| 1 | MDBFP – Available & Standby |
| 2 | Oil gun: HFO Pr/Temp=16 ksc/>110 Deg , Atom Steam: 6.5ksc/>220 Deg (Open steam drains @AB elevation) |
| 3 | Turbine on LP mode, Boiler Master in Manual(Manual Mode) |
| 4 | Isolate PRDS from CRH for this unit, Increase the set point to other units @ 13.5 ksc/ Temperature >280 deg |
| 5 | Open GS supply line drain to atmosphere |
| 6 | Charge APH soot blowing line from PRDS |
| 7 | Load-500 MW with 6 Mills(Roughly @ 55 tph each) |
| 8 | Cut feeding in top mill & Stop mill, other 5 mills >=40 tph/ load ~325 MW,In b/w reduce ThrotPr- 170 to 150 ksc |
| 9 | Take AB & CD elevation gun/ Start APH Soot blowing |
| 10 | Start MDBFP in Manual(cold) & Load/ unload anyone TDBFP(<=3500 rpm), MDBFP-auto & FW master-Auto |
| 11 | Switch off ESP fields as guns been taken & proved |
| 12 | Cut feeding in Bottom Mill & stop it/ Now 4 mills/ Ms Pr ~130 ksc/ load <=300 MW (Reduce feed in top mill too) |
| 13 | |
| 14 | Load~225 MW with 3 Mills+ 2 elev oil guns/ Unload TDBFP, keep load on MDBFP(Off CRH block v/v of TDBFP) |
| 15 | Trip the other TDBFP/ Reduce feed in bottom mill/Load~175 MW/ Unload one PA fan/ Reduce MsPr~90-100 ksc |
| 16 | Changeover UT to ST / Trip 2nd TDBFP |
| 17 | Trip bottom mill/ Load 140 MW/ 2 Mills +AB1324 CD13 or CD24 guns / only MDBFP in service |
| 18 | Bring load ~80 MW by cutting upper mill & opening HPBP further |
| 19 | Maintain drum at least +50mm to +100mm before hand tripping turbine(to avoid boiler trip on drum level Lo-Lo) |
| 20 | Hand Trip Turbine/ Turbine tripped (1 mill +6 guns i/s + MDBFP i/s) |
| 21 | Maintain TG lube oil temp>50 deg/MAL drain open/AOP starts @2850rpm/close all S/ RH spray v/vs |
| 22 | Stop mill, Stop guns/ boiler will Trip on Loss of all fuel/ All PA, HOTV/LOTV |
| 23 | Depressurise boiler to 45-50 ksc before closing boiler stop valve thru HP/LP bypass |
| 24 | Close Boiler stop valve/ De pressurise MS/HRH line thru HP/Lp BP/ after that close HPLP bypass/ Close manual of HPBP spray v/v |
| 25 | Purge boiler for 10 min(2 cycles) |
| 26 | Stop one set of ID and Fd fans after purging |
| 27 | cool boiler furnace Pr(= -10 to -20 mm)/ Monitor rate of ccoling by following BCW suction manifold temp<87 deg/hr |
| 28 | Drum level to be maintained as such till drum metal temp reaches 100 deg |
Thermal Power Plant Operation Information guide. Please find here the Stand ard Operating Procedures, Instructions to operate various capacity Thermal power plants in India. This is as per my experience and any abnormality found please refer other sources. Thank you.
Tuesday, March 13, 2018
Safe Shut Down Procedure-StageII 500 MW Rihand
Subscribe to:
Post Comments (Atom)
-
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
-
Generator Air Tightness Test Period Of Test= 24 Hrs without a Break Air Pressure Drop (Allowed in 24 Hrs) : <=0.15 ksc Air Test Pre...