Energy Tab
BHEL make 500 MW
Tuesday, August 21, 2018
Ash Handling System
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Stage 1 NTPC Dadri : H2 purging
HP & LP Bypass Operation and Protection
HP & LP Bypass Operation and Protection Purpose Boiler operation independent of the turbine Minimum steam flow through SH &...
Generator Air Tightness Test
Generator Air Tightness Test Period Of Test= 24 Hrs without a Break Air Pressure Drop (Allowed in 24 Hrs) : <=0.15 ksc Air Test Pre...
Drum Pressure Vs Silica Chart